The floor work begins.
The city came in and told us that we had to pull the old floor out and put in something else. Well what is another 10 grand or so. We pulled out all of the joists and topping (2 1/2 inches think with oak hardwood in some areas) and made ready for the concret-it team, Claude and his brother Cliff, from Sun Microsystems.
The guys from Concrete-it (1-800-818-0392 ask for Claude and tell them Jason sent ya) begin to put in the fill dirt.





0 Comments:
Post a Comment
<< Home